Cooling-Masters
Connexion · INSCRIPTION · Site Recevoir à nouveau l'e-mail de validation


Doing it again :) - 2x 2.5HP cascade - worklog

Ajouter ou retirer ce sujet de vos favoris  ·  Suivre ce sujet  ·  Imprimer ce sujet
Page précédente    Page suivante 
piotres


Membre
Messages : 369

dimanche 01 juillet 2012 à 12:30:59     
Hi

I'm doing it again - this time 2x 2.5HP cascade, without case, without optional adds, just pure power (I hope it'll be powerful ).

Specs :

compressors: HIGHLY (Hitachi) CTHU333WC6-U - R407c, 28488 BTU. 48.8ccm each - 2 pcs
evap: steeper 54mm
XV: captube 0.9 mm / captube 0.9 mm (on both stages)
HX: plate HX , 30 plates
condenser: 4.8 Kw, alu-cu, cooled by 2x 254mm 230V EBM fans
refrigerants : R507/R1150
oilseparator : Shine Year automatic
safety : 2x RANCO cut-offs (one to each stage) with manual reset, Torrecilla 6.0l expansion tank
case : Black metal baseplate
others: -

Work done till now:

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

To be continued ...

Regards
Peter
Google




     
piotres


Membre
Messages : 369

mardi 10 juillet 2012 à 00:21:56     
Update.

All is already brazed.

Image

Image

Image

Plus some electric done, but only to prepare the unit for loadtesting .

Image

Image

And some "final" electric. No more chineese switches (too much problems with them and they are not trustworthy). Now I use only Arcolectric (England).

Image

Image
moyen_moins


aka metalazzo | Anti²Bug
Messages : 10216

mardi 10 juillet 2012 à 09:55:51     
So much pipes everywhere
Waiting for load results.

You had a lot of problems with the chinese switches you used to use ?

Message édité par moyen_moins le mardi 10 juillet 2012 à 09:56:35
piotres


Membre
Messages : 369

jeudi 16 août 2012 à 01:25:47     
That should had been a worklog, but ...I hadn't got time to upload pictures .

Unit is already finished .

Image

First charge.

Image

CHY shows -120 :

Image

315W loaded with "cloth" insulation.

Image

Image

Image

Clear coat on polished pipes.

Image

Image

Image

Image

Image

Image

1st stage unloaded on CHY (-60*C).

Image

2nd stage unloaded on voltcraft (-107*C).

Image

Loaded with 315W after 4 hours test (-103*C).

Image

Image

Image

Image

Image

Finaly finished .

Image

Image

And almost ready to go.

Regards
Peter
piotres


Membre
Messages : 369

lundi 20 août 2012 à 01:04:01     
Movie on Youtube:

http://www.youtube.com/watch?v=zbcJwkk_gWM...=1&feature=plcp
Google




     
Page précédente    Page suivante